Phase 5: Program Monitoring, Evaluation, and Revision After implementation of the SWPPP in a facility, the information collected in the SWPPP Assessment Phase and the stormwater control measures selected in the Plan Design Phases must be kept up-todate by regular evaluation and revision via the following actions: (1) Conducting annual site evaluations Qualified personnel must conduct site compliance evaluations at appropriate intervals, but at least once a year (at least once in 3 years for inactive mining sites). As part of a facility’s compliance evaluations, operators are required to carry out the following:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(2) Recordkeeping: all inspections and reports A facility must record and maintain records of spills, leaks, inspections, and maintenance activities for at least one year after the permit expires. For spills and leaks, records should include information such as the date and time of the incident, weather conditions, cause, and resulting environmental problems. A facility’s SWPPP must be revised when there are major changes in a facility’s design, construction, operation, or maintenance. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
![]() |
Copyright @ January,2005 Prepared by Transportation Environmental Resource Center (TERC) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||